Mechanical Thruster – Kaybob Field

Posted on 2021/01/23

Mechanical Thruster

Consistent 2 Days Reduction in 311mm Intermediates

Location: Alberta, Canada

BACKGROUND

The Mechanical Thruster keeps the bit engaged with formation at all times, especially during transition zones. It balances pump open force and WOB, maximizing weight transfer and increasing ROP.

CHALLENGE

Major operator experiencing multiple trips per section and associated NPT, while pad drilling the 311 mm intermediate section.

SOLUTION

Optimized MT6-800 configuration and placement for maximum effectiveness. This resulted in a consistent elimination of one bit trip per intermediate section.

DOWNLOAD THE FULL CASE STUDY

Canada

United States

Turkey

Saudi Arabia

United Arab Emirates

Pakistan

CONTACT US

Message us and we'll share how can we help you minimize costs for your next drilling project wherever you are located.


plus minus