News Archives

Mechanical Thruster – Kaybob Field

2021/01/23

Mechanical Thruster
Consistent 2 Days Reduction in 311mm Intermediates
Location: Alberta, Canada
BACKGROUND
The Mechanical Thruster keeps the bit engaged with formation at all times, especially during transition zones. It balances pump open force and WOB, maximizing weight transfer and increasing ROP.
CHALLENGE
Major operator experiencing …

Read More

Mechanical Thruster – 35% ROP Increase

2021/01/23

Mechanical Thruster
Drilling Consistency Results in 35% ROP Increase
Location: Permian Basin, USA
BACKGROUND
The Mechanical Thruster keeps the bit engaged with formation at all times, especially during transition zones. It balances pump open force and WOB, maximizing weight transfer and increasing ROP.
CHALLENGE
A Delaware …

Read More

plus minus